Skip to main content
Permit rules
All calculators

Fence Calculator

Materials, cut list, and cost estimate in seconds.

Project details

Fence length in feet
Fence height in feet
Post spacing in feet

Gates

Gate width in feet

Materials

Picket width in inches
Picket gap in inches
Waste allowance in percent
Prices are U.S. big-box reference prices. Verify with your local supplier.

Fence takeoff results

15 sections, 18 posts, estimated materials $3,129. Estimate only.

Calculating your fence takeoff
Loading shopping list
Loading cut list
Loading cost summary
How to plan it

Plan it in 5 steps

  1. 1
    Walk and measure the line

    Measure each straight run separately rather than one total. Note corners, slope changes and every gate opening — those are where material counts change.

  2. 2
    Confirm the property line and setbacks

    Locate pins or a survey before you buy. Height and setback limits vary by jurisdiction; check yours and have utilities located before digging.

  3. 3
    Pick spacing and picket geometry

    Post spacing plus picket width and gap drive most of the cost. Try two or three combinations in the calculator and compare the totals.

  4. 4
    Verify your dimensions

    The estimator asks you to confirm key numbers before it produces lists, because one mistyped run length changes every downstream quantity.

  5. 5
    Take the list to your supplier

    Bring the material list and cut list, confirm live prices, and adjust the estimate if your supplier stocks different lengths.

Planning guidance only. Every quantity and price is an estimate — confirm dimensions and local requirements before you buy or build.

For contractors & trades

Fence estimating software for contractors

Fence contractors use this takeoff to price posts, rails, pickets and concrete to the job's ZIP, nest the cut list to cut board waste, check the permit and setback rules, then send the homeowner a branded proposal the same day.

  • Takeoff priced to your ZIP in minutes
  • Cut list that trims the lumber order
  • Branded proposal and invoice PDFs

Material and cost output is an estimate, never a quote. Permit content is guidance to verify with your local building department.

Frequently asked questions

Keep planning

Not sure where to start? Browse every calculator