Poured concrete pad with forms, gravel base, and rebar. Below is the standard parts list and cut list for a typical concrete slab, generated by the same engine that powers our free calculator. Quantities scale with your dimensions — this is the baseline shopping list before you customize.

Estimates only — not a quote. Baseline total: $616

Materials list
ItemQtyUnit costTotal
Ready-mix concrete (delivered)1.63 cu yd$165$268.95
Crushed gravel base1.63 cu yd$40$65.12
6mil vapor barrier roll (10×25)1 roll$55$55
Form lumber (2×4 × 12')5 ea$8$40
Form stakes (wood, 24")15 ea$2$30
Foam expansion strip44 ft$0.7$30.8
Rebar #4 (16" grid)229 ft$0.55$125.95
Cut list
PartQtySizeNote
Forms – long sides22×4 × 12'Set to finished slab elevation, stake every 3ft, brace corners.
Forms – short sides22×4 × 10'Butt into long sides; screw for easy removal after pour.
Rebar – long runs9#4 × 12'Set on chairs at slab mid-depth (~2").
Rebar – short runs10#4 × 10'16" spacing. Tie-wire at every intersection.