Skip to main content
Permit rules
Arizona · Shed guide

How to build a shed in Arizona

Gable-roof storage shed on a skid or concrete foundation. A gable-roof shed clears the garage without a foundation permit if it stays under the state's exempt square footage.

Typical cost
$2,355–$3,741
Time
2–4 weekends
Skill
Intermediate
Free planner

Get your Arizona shopping list in 60 seconds

Enter your dimensions. We compute the exact materials, cut list, and permit checklist for your state.

Start planning

Permits & code in Arizona

Sheds under 120 sq ft are typically permit-exempt at the state level. Setbacks from property lines still apply.

State-level rules only — cities and HOAs frequently add stricter requirements. Always confirm with your local building department before you dig.

What most people get wrong

  • Skimping on the foundation. A skid on bare dirt sags in two seasons.
  • Skipping the drip edge. Water siphons under shingles and rots the sheathing.
  • Framing walls at 24" OC when siding manufacturer specifies 16".

The 5-step shed plan

  1. Step 1
    Confirm site and permit path
    Locate property lines, call 811 for utility marking, and check whether your city/HOA needs approval before you break ground.
  2. Step 2
    Order materials
    Use the shopping list from our planner. Confirm delivery vs pickup — bulk lumber and concrete are usually cheaper delivered.
  3. Step 3
    Lay out and prep the site
    Batter boards, string lines, level the base. Getting this right saves days later.
  4. Step 4
    Frame the structure
    Follow the cut list. Check for square with the 3-4-5 method every few pieces. Fasten with the right structural screws.
  5. Step 5
    Finish and inspect
    Sand, stain/seal, and (if required) schedule your final inspection before backfilling or closing anything up.

Ready to build?

Get your exact Arizona-specific materials list, PDF blueprint, and AI build guide.

More Arizona guides