Skip to main content
Permit rules
All calculators

Door & Window Opening Calculator

Rough opening size, header starting point, studs, cripples and trim.

Opening

Unit width in inches
Unit height in inches
Header clear span in feet

Wall

Wall height in feet
Waste allowance in percent
Doors get 2" of extra width and 2-1/2" of height; windows get 1/2" all round. Header sizes here are a starting point, not an engineered design. Prices are U.S. big-box reference prices. Estimates only — not a quote.

Door & Window Opening Calculator results

Estimated materials $226. Estimate only.

Enter your ZIP to re-price materials, or keep national averages.

Reviewed weekly · price book updated See what changed
Rough opening
32" × 82.5"
Always confirm against the manufacturer's sheet
Header
Flat 2× on the flat (non-bearing)
35" long
Estimated total
$226

Email me this takeoff

We'll send the material estimate to your inbox so you have it on site — no newsletter.

Estimates only. One email, unsubscribe any time.

Shopping list

ItemQtyUnitTotal
2x4 studs (kings, jacks, cripples)14$4/ea$59
Header stock (Flat 2× on the flat (non-bearing))1$13/ea$13
Casing / trim75$2/ft$120
Shim bundles1$6/bundle$6
Low-expansion foam1$10/can$10
Sealant / caulk1$8/tube$8
Finish nails (1,000 ct)1$12/pack$12
Includes 10% waste allowance ($20)$226

Build summary

King studs
4
Jack studs
4
Cripples
4
Sill plates
none
Casing
68 ft
Header length
35"
Waste allowance
$20

Cut list & field notes

  • King studs4 @ full wall height (8')

    Nail kings to the plates first, then mark the header height off the floor.

  • Jack studs4 @ 82.5" (door) / to sill (window)

    Jacks carry the header — keep them tight to the kings.

  • Header2 @ 35" — Flat 2× on the flat (non-bearing)

    Crown up, spacer sandwiched, nailed from both faces.

  • Cripples4 @ header to top plate

    Keep them on the same layout as the wall studs.

Framing the whole wall?

The framing calculator prices plates, studs and sheathing.

Open framing calculator
For contractors & trades

Opening framing for remodel crews

Size rough openings, headers, kings, jacks and cripples for a whole punch list at once, flag the load-bearing ones that need engineering, and price the trim package for the client the same day.

  • Takeoff priced to your ZIP in minutes
  • Cut list that trims the lumber order
  • Branded proposal and invoice PDFs

Material and cost output is an estimate, never a quote. Permit content is guidance to verify with your local building department.